All projects
LOCATION
Mediterranean industrial corridor

MEASURABLE OUTCOME
24%
Peak demand reduction
2.4h
Critical-load resilience
THE CHALLENGE
The plant could not shift production and had limited tolerance for operational interruptions. Its largest electricity costs were driven by short, recurring peaks rather than total energy consumption.

THE APPROACH
ALISIO tested battery size and control strategies against interval data, maintenance windows and resilience requirements. Dispatch rules were designed to respond to real operating conditions instead of theoretical arbitrage.
THE IMPACT
The selected configuration reduces peak exposure, adds backup capability for critical loads and gives the operations team a transparent control strategy.