All projects
LOCATION
Spain and Portugal

MEASURABLE OUTCOME
10yr
Cost visibility horizon
64%
Renewable supply coverage
THE CHALLENGE
The group wanted longer-term energy visibility but did not want a procurement structure that transferred excessive volume or market risk to its operations.

THE APPROACH
We compared physical and virtual structures against the group demand profile, production outlook and risk limits. Contract volumes and duration were calibrated to complement existing supply rather than replace flexibility.
THE IMPACT
The final route improves budget visibility, supports measurable renewable claims and leaves room to adapt as the manufacturing footprint evolves.